Wednesday, June 13, 2012

As Temperatures Rise, So Does Aura

We are gearing up for the summer months ahead.  There's a lot of exciting progress happening inside the tower.

Corridor on the 10th floor.

Loft Suite on the 9th floor.

Interior of one of the residential elevators.

Concrete pour on the 24th floor, facing East.

A great perspective of the tower.

Keep checking back with us for more updates on Aura at College Park.